project
service
website
job
Switching trade software
New software,
same customers
Switching trade software rarely fails because of the new solution. It fails because nobody knows how customers, sites and jobs get out of the old program. That is exactly the part we take on, from selection through to going live.
The software switch in detail
View portfolioWhen switching pays off
Not every system needs replacing. These points, however, speak clearly in favour of it.
- Your technicians work on paper while the office enters the same data a second time
- The program only runs on one office PC, not on your colleagues' phones
- The vendor is discontinuing support or development
- You manage maintenance contracts and equipment in Excel next to the actual software
- You have to call support for every report you need
- Electronic invoicing requirements cannot be handled cleanly by the system
- There is no interface to accounting, everything is retyped
- Licence and maintenance costs no longer bear any relation to the benefit
If you recognise two or more of these, a comparison is at least worthwhile. Migrating the data is far less work today than most businesses fear.
Comparing trade software: what actually matters
Online vendor comparisons mostly rate feature lists. For a switch, other questions decide the outcome. Clarify these points with every vendor before you sign.
Data export
Can you get your data back later without the vendor's help? Have them show you the available export formats before you sign. It is the most important criterion and the one least often asked about.
Data import
Which data types can the system take on at launch, and in what format? Plain CSV imports for customers are rarely enough when sites, jobs and documents need to come along.
Mobile use
Can your technicians capture jobs, hours, photos and signatures straight on their phone, even without reception on site?
Trade specifics
Does the system reflect your particulars: equipment and maintenance contracts in plumbing and heating, inspection records in electrical work, measurements for painters?
Accounting
Is there a real connection to your accounting, or just an export your tax advisor then reworks by hand?
Electronic invoicing
Does the system handle the required e-invoicing formats, both incoming and outgoing?
Pricing model
What does it cost per user per month, which modules cost extra, and what happens when you grow from 5 to 12 employees?
Contract term
Cancellable monthly or locked in for a year? A vendor confident in their product does not need a long commitment.
Support and onboarding
Support in your language during your working hours, and real guidance at launch rather than just a knowledge base?
We fill in this table together during the consultation, for the systems on your shortlist. We deliberately do not publish a public rating of individual vendors, because feature sets and prices change faster than a table on the web can stay honest.
What is specific to your trade
A plain customer list looks the same everywhere. The difference lies in what is attached to it.
Plumbing, heating, air conditioning
Equipment, boiler types, serial numbers and maintenance contracts with intervals and due dates. If that link to the site is lost, you lose your maintenance business.
Electrical and photovoltaics
Inspection records, measurements, meter numbers and system documentation. These records have retention periods and must stay attached to the right site.
Painting, plastering, drywall
Service catalogues, measurement chains and text blocks for quotes. This is often years of costing work that nobody should have to retype.
Roofing and carpentry
Site photos, measurements and material lists per project, often with very large image files attached to the job.
Joinery and metalwork
Production orders, bills of materials, drawings and supplier items with purchasing terms.
Tiling and flooring
Costing templates per square metre, material master data and remaining stock management.
Facility, cleaning, pest control
Recurring visits, site lists with access information and service records for invoicing.
These links are the actual value of your data set. A migration that transfers only customer addresses is technically complete and functionally worthless.
Read on
Concrete routes into a new system and the details of the migration process.
Moving to Meisterwerk
Setup, data migration and training for the switch to the trade software Meisterwerk. To the Meisterwerk switch
Moving away from TAIFUN
The classic switch from a locally installed office system: how your data gets out. To the TAIFUN migration
The migration process
Assessment, mapping, test migration, sign-off and cut-over in detail, including packages and price ranges. To data migration
Software selection
Still undecided? We assess requirements, vendors and follow-up costs neutrally before you commit. To software consulting
Our clients
Our clients: J3L, Fair Kiez, HTW Berlin, Neo Fashion, SIB, EUV, Zahnkultur, Lexus, Neustadt, Opel, Universal, Zalando, BTB, Lottili, Mayaciel, E-Solaris, Frau Kruner, Spitzke
The switch on a timeline
This is what a typical switch looks like when it is planned rather than improvised. This timeline applies to a typical business with 5 to 25 employees. Larger data sets or a legacy system without an export function mainly stretch weeks 1 to 3.
Frequently asked questions about switching trade software
Get in touch
Migration check for your business
Tell us your program and the size of your business. Afterwards you know whether customers, sites and maintenance contracts carry over in full and how long the switch takes. At no cost.
Monday to Friday, 10:00 to 18:00 (German time)
Product and company names mentioned are trademarks of their respective owners. We name them descriptively only, to identify the systems we migrate from or to. No business relationship or certification is implied.



